What it is

A manufacturing unit above a certain number of workers needs a licence from the state factories department. Since 21 November 2025 this is governed by the Occupational Safety, Health and Working Conditions Code, 2020, which replaced the Factories Act and raised the thresholds, as we read it, to 20 workers where power is used and 40 where it is not.

States are still bringing their rules in line with the code, so forms and fees differ. Many states also need the building plan approved before construction or major changes. We check what your state requires today.

What you get

  • A check of whether your unit needs a licence under current state rules
  • Factory plan approval application, where your state requires it
  • Factory licence application with the required certificates
  • Coordination with your engineer for the stability certificate and drawings
  • Replies to queries and inspection support

Why it's worth having

Avoid prosecution

Running a factory without a licence can lead to fines and prosecution of the occupier.

Bank and insurance

Lenders and insurers ask for the licence.

Safer workplace

The process checks exits, machinery guards and working conditions.

Who needs it

Manufacturing units that employ, or plan to employ, workers above the threshold under the OSH Code and their state rules.

Manufacturing

How it works

  1. Threshold check

    We confirm whether a licence is needed in your state today.

  2. Plan approval

    Where required, we file drawings for approval before construction.

  3. Licence application

    We file with the certificates and pay the fee.

  4. Licence issued

    We follow up through any inspection until it is issued.

Documents you'll need

  • Site plan and building drawings of the factory
  • Proof of ownership or lease of the premises
  • Building stability certificate from a chartered engineer
  • List of machinery, power load and manufacturing process
  • Number of workers expected
  • Consent to operate from the pollution control board, where needed

How long it takes

Plan approval and the licence together usually take one to two months, depending on the state and whether an inspection is needed.

Not included

  • Government licence fee
  • Engineer's drawings and stability certificate
  • Fire NOC, quoted separately

Common reasons for delay or rejection

We check these before filing, so they don't hold you up.

  • Drawings do not match the building as constructed
  • Pollution board consent is missing
  • The occupier and manager are not properly named

Questions people ask

Is it still called a factory licence?

Yes, in most states. The OSH Code aims at one registration and one licence, but states are moving at different speeds.

We have fewer workers. Do we need anything?

Even below the threshold you may need a Shop Act or other state registration. We will tell you what applies.