What it is
Most manufacturing units, and some service units, need two permissions from the state pollution control board. Consent to Establish (CTE) is needed before construction or installing machinery. Consent to Operate (CTO) is needed before production starts, and is renewed periodically.
Industries are grouped by pollution potential into red, orange, green and white categories. White-category units are generally exempt from consent and only need to inform the board. The category decides the documents, fees, timelines and how long consent is valid.
What you get
- A check of your industry category and whether consent is needed
- Consent to Establish and Consent to Operate applications on the state portal
- Coordination with your engineer for pollution control details
- Replies to board queries and inspection support
Why it's worth having
Start legally
Running without consent can lead to closure orders and disconnection of power and water.
Bank finance
Lenders and subsidy schemes ask for CTE or CTO.
Factory licence
Consent is usually needed before the factory licence is issued.
Who needs it
Manufacturing units and certain service units such as workshops, hospitals, hotels and warehouses that fall in the red, orange or green category in their state.
Manufacturing
How it works
Category check
We classify your activity under your state's list.
Documents
We list what the board needs, including any technical reports.
Application
We file CTE or CTO and pay the board fee.
Consent
We follow up and support the inspection until consent is issued.
Documents you'll need
- Proof of land or premises and site plan
- Project report with capital investment and production capacity
- Process flow chart and list of raw materials and machinery
- Details of water use, waste water, air emissions and solid waste
- Udyam, GST and constitution documents of the business
How long it takes
Green-category units can get consent in a few weeks; orange and red units usually take one to three months, depending on the board and any inspection.
Not included
- Board fees, which depend on category and investment
- Engineering design of pollution control equipment
- Environmental clearance for large projects
Common reasons for delay or rejection
We check these before filing, so they don't hold you up.
- The activity falls in a category not allowed at that location
- Waste water or emission details are incomplete
- Production started before consent was granted
Questions people ask
How do I know my category?
Each state board publishes a list. We check your exact activity and confirm.
How long is consent valid?
It depends on the category and state, and is often longer for green units. We remind you before renewal.
Related services
Packaged goods registration (legal metrology)
Anyone who packs, repacks or imports products for sale
Quote on request Callback
Factory licence
Manufacturing units above the worker threshold
Quote on request Callback
BIS certification
Makers and importers of products under mandatory standards
Quote on request Callback